top of page

Rigging and personnel requirements may change depending on the nature of the venue and production. 

The act may be adapted to smaller stages and/or static height on request. 

Music and costuming as well as aspects of the artistic presentation are adjustable to production theme

For questions, please contact us!

Technical Requirements

Equipment and Performer Dimensions

  • Solid 7/8" steel aerial hoop, 1m diameter and 1.5m cable-core cotton rope cord, 9kg

  • Total weight of acrobats plus equipment approx. 135kg

  • 5:1 pulley system (if required): 

Required Performance Space Dimensions

  • Ceiling height minimum 6m (19.5ft)

  • Clear floor space around point 4x5 meters (12x16 ft)

Rigging Points

  • PREFERRED: One central ceiling point connected to aerial motor, capable of lifting two acrobats safely during dynamic loading (3500lb WLL)

  • ALTERNATE: (IF INSTALLING 5:1 PULLEY SYSTEM): A height-adjustable aerial point on rated cable or static cord installed with pulleys, with the primary point centrally located where the performance will happen, and a secondary pulley located side stage above a suitable anchor (floor plate/pin rail/water ballast, etc). The aerial point must already be equipped with a swivel and carabiner, and a cleat or ascender must be installed on the floor anchor. If such a system does not already exist, please contact us to see about hiring a certified rigger to see if it's possible to install this system for your venue.

  • Human-load bearing rigging points and floor anchor must be capable of supporting minimum working load 3500lbs each.

Lighting and Sound

  • Sound system capable of connecting to or playing MP3 format music

  • Lighting sufficient for performance safety covering entirety of working area 

Personnel

  • One winch operator for winch operation and 1-2 pullers if on pulley system dependent on the system; we can provide our own winch operator and/or pullers if needed, please contact us

  • A certified rigger is typically necessary for installation and/or verification of anchorage points and rigging.

  • Estimates for cost of puller as well as rigging for site inspection, load-in and break-down can be made upon consultation

Rehearsal Requirements

  • Approximately 15 minutes of staging time is necessary to verify all heights and stage space for the act with winch/pulley operators before going into technical rehearsal (lighting and running the act with sound and lights)

Artist Requirements

  • Clean, dry room-temperature dressing room with access to toilets and mirrors with sufficient lighting

  • Clean, unobstructed floor space sufficient to warm up, approximately 3x3 meters (10x10 ft)

  • Access to fresh water

  • Secure area for artists' personal belongings

  • Artists and equipment must be kept secure from audience interference during the course of the act

Regarding Safety

  • The artists reserve the right to inspect the security of the rigging and venue

  • Concerns will be brought to the production as quickly as possible in order to seek resolution

bottom of page